Pompano Beach Seawall Raise Deadline: When You Must Raise to 5 Feet

A Pompano Beach seawall below 5 feet NAVD88 has to be raised when tidal water flows through or over it onto a neighbor or the right-of-way, when it is not kept in good repair, or when it undergoes substantial repair. After a citation, you have 60 days to show progress and 365 days to get permits, build and pass final inspection (city flyer).

Updated October 26, 2026 · Sources linked throughout and listed below · General information, not legal or engineering advice

The three triggers

The city's Build It High flyer lists the scenarios that require a barrier below 5 feet NAVD88 to be raised or replaced (city flyer):

  1. tidal water flows unimpeded through or over the barrier onto adjacent property or a public right-of-way,
  2. the barrier is not maintained in good repair,
  3. the barrier is undergoing substantial repair or rehabilitation, in which case the new barrier runs along the property's entire shoreline.

Dock work can start the clock

Substantial repair includes modifying more than 50 percent of the length of your shoreline, and also modifying or installing attached structures, such as docks, when the cost exceeds 50 percent of the cost of a barrier along the whole shoreline, as determined by the City Engineer. The city adds that if your barrier is below 5 feet and you modify a dock, piling or boat lift, your contractor must submit a cost analysis that includes the estimated cost of raising the barrier to 5 feet (city flyer). A boat lift project is often the moment Pompano owners learn their wall is low.

The citation clock

The owner must show progress toward repairing the cited defect within 60 days of the citation. No later than 365 days after the citation, the owner must obtain permits, build, and get final inspection approval of improvements that meet the minimum elevation and design rules (city flyer). Section 151.05 treats a barrier that lets tidal water onto a neighbor or the right-of-way as a citable public nuisance (Sec. 151.05).

Fitting the work into a year

A Pompano seawall job needs two city permits, a building permit and an engineering permit from the City Engineer, plus the Broward County Environmental Resource General License. Each permit has its own inspections. See Pompano Beach seawall permits for the list, and email [email protected] with questions.

For the elevation range itself, see the Pompano Beach seawall height requirement.

Planning seawall work in Pompano Beach?

Call (754) 484-1777 or request a free quote at ftlseawallrepair.com. We connect Pompano Beach waterfront owners with licensed, insured local seawall contractors who handle the engineering, permits and inspections. We do not perform the work ourselves.

Call (754) 484-1777

Pompano Beach seawall questions

Will a new boat lift force me to raise my seawall in Pompano Beach?

It can. If your barrier is below 5 feet NAVD88, your contractor must submit a cost analysis that includes raising it. If the dock or lift work exceeds 50 percent of the cost of a barrier along your shoreline, as determined by the City Engineer, the wall must be raised.

How long do I have after a seawall citation in Pompano Beach?

60 days to show progress, and 365 days to obtain permits, build and pass final inspection on improvements that meet the minimum elevation and design rules.

When did Pompano Beach's seawall standards take effect?

The city says it implemented the current tidal flood barrier standards in January 2022, in Chapter 151 of its code.

Sources

  1. City of Pompano Beach: Build It High tidal flood barrier flyer (2024)
  2. City of Pompano Beach Code Sec. 151.05: Tidal Flood Barriers

Codes and procedures change. Confirm requirements for your property with the City of Pompano Beach, Broward County and a licensed professional.